Dynamic Simulation Success Stories
- Refrigerant compressor blocked discharge study—saved project costs by reducing design flare loading.
- AP-C3MR™ SplitMR™ process feed booster compressor trip study— helped plant to avoid refrigerant compressor trip during the transition. This configuration is now widely accepted and practiced utilizing the full power available from two identical gas turbines.
- AP-C3MR™ parallel refrigerant compression string trip study—results enabled the plant to avoid sympathetic trips of additional compression strings when one string trips, allowing continued production at the lower rate.
- AP-X® process control and operability study—enabled smooth implementation of this novel process design that currently operates with high reliability in the largest LNG trains in the world (7.8 MTPA/ train).